Shoreline delivered the fast-tracked detailed design of a concrete cut-off barge ramp and associated berthing infrastructure at Tingira Street, Cairns. The design addressed soft ground conditions, potential differential settlement and tidal construction constraints while accommodating the facility's barge operations.
Scope of Works
-
Designed the ramp and three berthing dolphins, including an outer dolphin configured for barge manoeuvring.
-
Incorporated prefabricated concrete blocks into the retaining wall to improve constructability within the tidal zone.
-
Adopted a jointed slab arrangement to accommodate potential differential settlement at the ramp edges.
-
Considered soft clay conditions and remnants of an existing rockfill groyne in developing the structural arrangement.